Gurgaon-Palwal Transmission Project (GPTL)

To meet the rising power demand in Gurgaon and Palwal, Sterlite Power is commissioning three GIS substations and two bays. Besides augmenting power supply for key geographies that host energy intensive establishments, the project will also improve reliability of electricity supply for manufacturing & service sectors. The substations will cater to parts of Gurgaon and connect other substations located at Palwal, Rangla, Rajpur and adjoining areas of Meerpur and Kurah in Haryana, as part of Inter-State Transmission System. This will help the region to continue generating employment to address markets in India and overseas.

PROJECT STORY

The ROW issues and timely approvals from power distribution utilities were established as potential challenges for the project. Building the infrastructure on the heavily forested land in the region would require clearances as well. During the execution phase, the creation of a fully automated gas insulated substation would also increase the complexity of the project.

Our teams worked simultaneously on getting approvals from various entities and departments for the project during the planning phase. We also used monopoles to reduce the land requirements by 80% and preserve the forest areas as much as possible. Micro piling to create the foundation for the monopoles allowed us to minimize impact on the land. Constructing the gas insulated substation underground would require expertise as well, as it would have to work independently and without human intervention in the future.

This project will span over 136 kms while delivering over 3000MVA to enhance power transmission in the region.

Project Detail

Dedicated teams for forest and ROW clearances have been identified and working independently with pre-planned ways.

TIMELINES

Neemrana - Dhonanda

  • State: Rajasthan, Haryana
  • Length: 45
  • Start Date: Mar - 17
  • End Date: --
  • Construction Status: WIP

Aligarh - Prithala

  • State: UP, Haryana
  • Length: 44
  • Start Date: --
  • End Date: --
  • Construction Status - WIP

Prithala - Kadarpur

  • State - Haryana
  • Length - 27
  • Start Date: --
  • End Date:--
  • Construction Status - WIP

Kadarpur - Sohna

  • State - Haryana
  • Length - 11
  • Start Date: --
  • End Date:--
  • Construction Status - WIP

LILO at Sohna

  • State - Haryana
  • Length - 0
  • Start Date: --
  • End Date:--
  • Construction Status - WIP

PROJECT GALLERY

RELATED PROJECTS

Arcoverde

Jabalpur Transmission Project (JTCL)

DISPONIBILIDADE DO SISTEMA

NOME DO PROJETOMARCH 2018DISPONIBILIDADE DESDE COD
ENICL99.6299.67
BDTCL99.4199.87
JTCL98.5499.77
RTCL99.0799.86
PKTCL99.9699.98
NRSS-XXIX98.4799.74
MTL100.0099.98
OGPTL100.00100

FEEDBACK

    FEEDBACK