PROJECT STORY

The Lakadia Vadodara Transmission Project Limited has is a “Green Energy Transmission Corridor” project aimed at meeting India’s renewable energy target of installing 175 GW by 2022. The transmission line will connect the wind energy zones of Bhuj to the load centres in Maharashtra and Gujarat. The Lakadia – Vadodara 765 kV D/C line will help in the evacuation of power from renewable energy (RE) sources in Kutch to Vadodara for onward dispersal.

Project Detail

Length: ~329 km

Power: 765 kV Double Circuit (Hexa) line

Deadline: SCOD as per TSA is 31/12/2010

Project Elements:

Element 1 – Lakadia – Vadodara 765 kV D/C transmission line

Element 2 – 765 kV AIS Bay at Lakadia

Element 3 – 765 kV GIS Bay at Vadodara

State: Gujarat

TIMELINES

Lakadia-Vadodara 765 kV D/C Line

329 km | 798 locs.

330MVAr switchable line reactors at both ends of Lakadia – Vadodara 765kV D/c line

1X110 MVAR, 765 kV, 1 ph. Switchable line reactor (spare unit) at Vadodara end

765kV

765kV bay extn at Lakadia SS (AIS) and Vadodara SS (GIS)

765kV

PROJECT GALLERY

RELATED LINKS

GOA TAMNAR TRANSMISSION PROJECT LIMITED

VINEYARDS

UDUPI KASARGODE TRANSMISSION LIMITED

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK

    FEEDBACK