INTRODUCTION

This northernmost region of India faces severe power deficit, crippling daily life and adversely impacting its path to progress. The problem gets a lot worse during the harsh winters, as less hydropower is generated. There was a need to connect the Valley with the Northern Grid via a reliable transmission corridor.

RELATED CASE STUDIES

Vineyards: Use Of Aerial Technology To Power Brazilian Grid

Skyrob: Making Opgw Stringing Safe

Project Ganga: Excellence In Project Execution And Product Innovation

SYSTEM AVAILABILITY

Projects DEC 2019 Availability since COD
ENICL 99.82 99.54
BDTCL 99.90 99.71
JTCL 100.00 99.54
RTCL 100.00 99.84
PKTCL 100.00 99.93
NRSS-XXIX 98.61 99.67
MTL 100.00 99.95
OGPTL 100.00 99.95
PTCL 100.00 99.94
KTL 100.00 100.00
GPTL 99.81 99.60

FEEDBACK

    FEEDBACK