Network congestion, low corridor intensity and constraint power capacity are the prime pain points of the existing transmission infrastructure.

our solution
2x to 3x increase in throughput is achieved by replacing the old conductors with High Performance Conductor solutions on the existing corridors, which meet the same mechanical sag and load conditions of the existing towers. This is done using minimal shutdown of 6 to 8 hours daily.
Outcome
Our uprating solutions reduce the losses and better the tower clearances and loading conditions. Hence, increasing the transmission capacity by almost 2x to 3x.
Sterlite Power heralds in pioneering new technology in India with ‘Zero Shut Down Reconductoring’. Pilot project addresses transmission congestion challenges through innovation, while creating social impact.