Farakka Malda

December 18 2017

introduction

PGCIL was seeking a solution that could enable enhancement of the power transfer capacity on the existing tower structures. There was no scope of building of additional line due to extreme ROW with congested residential corridor and unrest situation. The project experienced challenging state of affairs with conductor stringing across Ganges basin, railway line crossing and also installing during social unrest in the West Bengal region.